Ability to NOT run checks at regular intervals

I have a group of checks that runs on CRON on production and that's fine; but I also have a very similar group of checks (as per your doc about dynamic checks) configured to run on Vercel deploys on pre-prod. I don't need to this second group to run on CRON intervals; the trigger by Vercel is enough.
As of today, even if set to run every 24h, these checks are totally unuseful to me. Could we select "external trigger" as a frequency option ?

Please authenticate to join the conversation.

Upvoters
Status

In Review

Board

💡 Feature Request

Tags

Scheduling

Date

About 2 years ago

Author

JB Théard

Subscribe to post

Get notified by email when there are changes.